Skip to Content
The platform tour

Ten stops.
All of them real.

This is the whole system, in the order a job passes through it. Every stop is described in a paragraph and then shown with the screen the person doing that job actually looks at. Where a capture is still missing, you will see a labelled frame saying exactly what belongs there.

01 · Sales

The enquiry becomes a project before anyone drives anywhere.

However the call comes in, it lands as an opportunity with an owner, a location and a value. At the same moment the technical side opens its own project, so the survey team sees the job coming instead of hearing about it when somebody forwards an email.

new, qualified, proposition, won — with the value of each stage totalled at the top
The pipeline — new, qualified, proposition, won — with the value of each stage totalled at the top
contact, salesperson, expected revenue, the site location and the survey status, plus a message button that reaches the customer where they already are
One opportunity — contact, salesperson, expected revenue, the site location and the survey status, plus a message button that reaches the customer where they already are
02 · Field

Measuring is a job for a phone, not a clipboard.

Two modes: a fast pass for the sales visit, and a five-step precision pass before production. Both group openings by floor, both take a photo and a laser reading per opening, and both compare what was measured against what was quoted.

100% complete, area variance measured against the quotation, an elevation preview of every opening, and the whole approval conversation kept on the record
An approved survey — 100% complete, area variance measured against the quotation, an elevation preview of every opening, and the whole approval conversation kept on the record
a purpose-built capture layout, not a shrunken desktop form
The same job on site — a purpose-built capture layout, not a shrunken desktop form
who is going where, when, for which job, and what state each visit is in
Every survey, scheduled — who is going where, when, for which job, and what state each visit is in

What the surveyor never has to do

  • Copy a customer address out of an email
  • Keep a separate photo folder per site
  • Re-type measurements into a spreadsheet that evening
  • Guess whether an opening is within tolerance
  • Have an internal licence — a portal login is enough
03 · Design

The drawing lives inside the order — not beside it.

Not a picture attached to a quotation. A structured model of the unit that everything downstream reads: fixed, casement, sliding, tilt-and-turn, arched, folding, curtain wall, mesh and decorative bars, drawn by touch or mouse and viewable in three dimensions.

a composite unit: fixed top light with a decorative grille, a tilt-and-turn sash with its opening shown, a fixed light, a side light and a masonry sill, fully dimensioned
The designer — a composite unit: fixed top light with a decorative grille, a tilt-and-turn sash with its opening shown, a fixed light, a side light and a masonry sill, fully dimensioned
profile depth, glass layers and sash projection — no export, no second file, no extra licence
The same unit, in 3D — profile depth, glass layers and sash projection — no export, no second file, no extra licence
04 · Estimating

Quantities are measured, never typed.

Saving a drawing runs an analysis over it. Every element is classified, measured from its own geometry, matched to a product in your catalogue and costed. That analysis is what the quotation, the purchase list and the cut plan all read.

main bars and special bars in metres, glass area, hardware sets, and a tab for every component family
The take-off — main bars and special bars in metres, glass area, hardware sets, and a tab for every component family
surveyed, produced, delivered and installed counted separately on every line, so “how much of this job is done” is a number rather than an opinion
The order line, tracked — surveyed, produced, delivered and installed counted separately on every line, so “how much of this job is done” is a number rather than an opinion
volume breaks, cost-plus markup, margin guarantees, ceilings and psychological pricing — each approved before it is allowed to price anything
Pricing rules — volume breaks, cost-plus markup, margin guarantees, ceilings and psychological pricing — each approved before it is allowed to price anything
cumulative progress, previous progress, advance recovery, retention held and net amount due — the arithmetic a main contractor expects to see
A progress certificate — cumulative progress, previous progress, advance recovery, retention held and net amount due — the arithmetic a main contractor expects to see
05 · Catalogue

Your systems, your hardware, your colours.

A drawing is only as good as what it can be built from. The catalogue holds the profile systems you actually buy, the glass build-ups you actually quote, the hardware your supplier actually ships, and the finishes your customers actually choose.

single, double, triple and laminated build-ups with thickness, U-value and safety rating on every specification
Glass — single, double, triple and laminated build-ups with thickness, U-value and safety rating on every specification
handles, hinges, locks, gears, restrictors and rollers — with supplier code, system, family, material, price and stock on hand
Hardware — handles, hinges, locks, gears, restrictors and rollers — with supplier code, system, family, material, price and stock on hand
brand and series matched to an application — folding, sliding, casement, tilt-and-turn — so the right fittings are chosen for you, by rule, not by memory
Hardware sets — brand and series matched to an application — folding, sliding, casement, tilt-and-turn — so the right fittings are chosen for you, by rule, not by memory
solid colours, wood textures and RAL references with a real swatch, rendered live on the drawing and carried into the order
Colours & finishes — solid colours, wood textures and RAL references with a real swatch, rendered live on the drawing and carried into the order
06 · Technical

Measure again before you cut anything.

Between a sales survey and a plastered opening there is always a difference. The technical team owns that gap: a second precision visit, a variance check against the sold drawing, and a decision that either passes or triggers a revision. Nothing reaches the saw until it is signed.

completion rate, open tasks, workload by team, requests by type, and what is overdue right now
The technical control tower — completion rate, open tasks, workload by team, requests by type, and what is overdue right now
site survey quotes, drawings and fabrication requests moving through new, assigned, in progress and completed
The request board — site survey quotes, drawings and fabrication requests moving through new, assigned, in progress and completed
07 · Factory

Where the material money is won or lost.

The approved job becomes a production order carrying every unit. From it the system nests the bars and the glass sheets, reserves stock, raises the work orders along your routing and prints the labels — and reports its own yield while it does.

overall equipment effectiveness, active orders, material waste rate, output against scheduled capacity, downtime causes and the state of every work centre
The factory, live — overall equipment effectiveness, active orders, material waste rate, output against scheduled capacity, downtime causes and the state of every work centre
bars used, ordered and used millimetres, reusable remainder, waste excluding reusable, and the yield the optimiser achieved
A generated cut list — bars used, ordered and used millimetres, reusable remainder, waste excluding reusable, and the yield the optimiser achieved
every usable remainder with a reference, a length, a storage location and the job it came from — offered first on the next plan
Off-cut inventory — every usable remainder with a reference, a length, a storage location and the job it came from — offered first on the next plan
scan a piece or pick it from the list; the counter tracks pieces done today and first-pass yield
The station terminal — scan a piece or pick it from the list; the counter tracks pieces done today and first-pass yield
which order it belongs to, which stage it reached, whether it has been inspected — for every unit in the building
Every piece, by serial — which order it belongs to, which stage it reached, whether it has been inspected — for every unit in the building
08 · Quality & dispatch

Gates that actually hold.

A checklist that anyone can skip is decoration. These sit in the workflow: after cutting, after welding, at glazing, at hardware, before packing, before dispatch. Fail one and the job does not move on — it raises a non-conformance against the piece, the station and the operator.

incoming material, after cutting, after welding, glazing, hardware and finishing, final pre-pack, pre-dispatch, delivery and installation
The checklists — incoming material, after cutting, after welding, glazing, hardware and finishing, final pre-pack, pre-dispatch, delivery and installation
every label that was printed, by whom, to which printer, in which format — and reprinted if a unit is damaged
Labels, tracked — every label that was printed, by whom, to which printer, in which format — and reprinted if a unit is damaged
09 · Site

Delivered is not finished.

This is where most systems hand you back a spreadsheet. Here, every unit walks through the stages you defined — delivered, frame fixed, sash hung, sealed, cleaned — with a photo where the stage demands one, ticked off by the fitter on their own phone, working offline when the site has no signal.

overall progress, actions today, items by state, a funnel from sold to installed, and who is doing what
The site, from the office — overall progress, actions today, items by state, a funnel from sold to installed, and who is doing what
actions today, earned this week, snags to fix, ready to hand over
The fitter’s day — actions today, earned this week, snags to fix, ready to hand over
each opening is a ring you tap through, with photo evidence where required
One job, unit by unit — each opening is a ring you tap through, with photo evidence where required
planned, needs attention, done — without calling the office
The month ahead — planned, needs attention, done — without calling the office
10 · Service

The five years after the handover.

A customer calls in year three about a stiff handle. The service order already knows which unit, which order, which installer fitted it, which hardware set is in it and whether it is still covered — so the technician arrives with the right part instead of a notebook.

customer satisfaction, open requests, requests by category and state, the warranty versus billable split, and a technician leaderboard
After-sales, live — customer satisfaction, open requests, requests by category and state, the warranty versus billable split, and a technician leaderboard
the reported problem, the site, the warranty and billing decision, and the affected items picked straight from the original order
A service call — the reported problem, the site, the warranty and billing decision, and the affected items picked straight from the original order
And so your team can actually use it

The manual is part of the product.

A system this wide is worth nothing if only two people in the company can drive it. So the documentation is not a PDF someone emailed you during onboarding — it is a searchable library inside the system, a public help centre on the web, and guided routes that walk a new user from first login to a finished job.

articles by domain, guided routes, interactive walkthroughs, and the search people actually use
The library — articles by domain, guided routes, interactive walkthroughs, and the search people actually use
first login, your first quotation in twenty minutes, enquiry to installed job, order to shop floor, survey to finish — each with its own step count and audience
Guided routes — first login, your first quotation in twenty minutes, enquiry to installed job, order to shop floor, survey to finish — each with its own step count and audience
an interactive map of departments and handovers that every customer can redraw for their own company, linked to the articles that explain each step
Your own process map — an interactive map of departments and handovers that every customer can redraw for their own company, linked to the articles that explain each step
full right-to-left layout — navigation, cards and search all mirrored, not a language file bolted on at the end
The same, in Arabic — full right-to-left layout — navigation, cards and search all mirrored, not a language file bolted on at the end
Check it yourself

Every claim on this page, and where to find it.

In the demo session, open these in this order. If something on this page is not there, we would rather you found out in the first hour than in month three.

The claimWhere it lives
The designer is inside the orderSales ▸ Orders ▸ any line ▸ Edit Design
Quantities come from the drawingthe same line ▸ Design Analysis
Your catalogue drives the drawingSystem ▸ Profiles & Glass, and System ▸ Hardware
Surveys compare quoted against measuredTechnical Tasks ▸ Site Surveys ▸ All Surveys
Nesting reports its own yieldProduction ▸ Cutting & Off-cuts ▸ Cutting Plans
Off-cuts return to stockProduction ▸ Cutting & Off-cuts ▸ Off-cut Inventory
Machine files come out of the planany cutting plan ▸ the export buttons
The floor runs on a terminalProduction ▸ Shop Floor ▸ Shop Floor Terminal
Every piece has a serial and a historyProduction ▸ Shop Floor ▸ Produced Units
Installation is tracked per unitInstallation ▸ Dashboard, then Work Packages
Snags block handoverInstallation ▸ Snags
Billing follows delivered progressSales ▸ any order ▸ BOQ Invoices
Customers and crews get their own loginthe portal at /my
The manual ships with itUser Manual ▸ Knowledge Workspace, or /help
Book a working session

Stop reading about it.
Open the system.

We will run your own workflow through a live tenant — your profile system, your glass spec, your paper size, your currency — and hand you the mouse. Bring one real job and we will take it from enquiry to invoice in front of you.

45–60 minutes · no slides · run on a real database · English or Arabic