Five nesting strategies, and every plan reports its own yield.
Material is the biggest number on a window factory's cost sheet, and the difference between a good nest and an average one is measurable on every bar.
Five strategies, and the plan tells you which one paid
- Greedy, knapsack, hybrid, exact dynamic programming, and an external solver
- Kerf, end trim, reusable-rest threshold and a cap on distinct cut sizes
- Yield reported on the plan itself — this one returned 99.56 % on 5800 mm stock
- A 5,257 mm remainder put back on the shelf rather than into the skip
Glass nested as sheets, not as a list
- Shelf packing with kerf, and rotation where the pane allows it
- Utilisation per sheet
- A glass cutting list the cutter can work straight from
Straight to the machine
- Saw CSV, machining-centre DXF and generic G-code, per machine
- The cutting plan is the source, so the file and the paperwork cannot disagree
The numbers on the wall
Yield and waste surface on the Production Control dashboard, with a per-day waste sparkline and a downtime Pareto beside it.
What it produces
A routing graph, a finite-capacity scheduler, and a simulator you can run before you buy the machine.
The hub All fifteen departmentsEvery desk in the business, and what it gets.
Next Production & Shop FloorBuilt for gloved hands — and your operators do not need an Odoo seat.
أحضر فتحة واحدة.
ونشغّلها من أولها إلى آخرها.
رسم، أو نظام قطاعات، أو عرض سعر سبق أن أرسلته. نحمّل كتالوجك على نسخة حية وننتقل به من الفتحة المقاسة إلى عرض سعر مسعّر، وقائمة مواد مكلَّفة، وقائمة قص مرتّبة، وسجل إنتاج — والفأرة في يدك.
45–60 دقيقة · بلا عروض تقديمية · على قاعدة بيانات حية · بالعربية أو الإنجليزية · نرد خلال يوم عمل واحد