Platform · 04 of 15 · Technical office manager, surveyor

Measured twice, compared against the order, before anything is cut.

Two visits, and the second one exists because the first was made to win the job, not to cut it. What the technical office does between them is the difference between a frame that fits and a frame that comes back.

Two surveys, deliberately not the same thing

  • A pre-quote survey starts empty — the surveyor adds openings as they find them
  • A production survey is populated from the confirmed order and refuses to start without lines
  • Each has its own numbering, its own report, its own approval, its own mobile app
  • A production survey can be seeded from the pre-quote instead of from scratch

Measured against quoted, with a tolerance that bites

  • Quoted width, height, area and quantity beside the measured ones, per opening
  • Width, height, area and quantity differences, and a pass/fail per item
  • A survey outside the configured tolerance goes to a manager instead of to the saw
  • The surveyor is warned on site, before they drive away

The survey happens on a phone, and the phone is often offline

  • A portal login, not an ERP seat
  • Bluetooth laser meters — Leica DISTO, Bosch GLM, Stanley TLM and generic BLE
  • Photos per opening, GPS on start and finish, and a signature with the signer's capacity
  • Saves queue on the handset and replay in order when the signal comes back
  • A tappable elevation drawing to move between openings

A production design that never touches the signed order

  • The survey line carries its own drawing, independent of the one the customer signed
  • Editing it re-runs the take-off against the measured sizes
  • The original stays visible beside it, so the change is reviewable
What this desk watches

The numbers on the wall

The Technical control tower: completion rate, open requests, surveys done against surveys booked, workload by person, and requests by type. Survey reporting adds surveyor performance and monthly statistics as pivots.

Area difference against quoted Surveys pending approval Re-visits requested

What it produces

A pre-quote survey report
A production survey report with quoted against measured
A production order, with the measured sizes
45 دقيقة، مشروعك أنت

أحضر فتحة واحدة.
ونشغّلها من أولها إلى آخرها.

رسم، أو نظام قطاعات، أو عرض سعر سبق أن أرسلته. نحمّل كتالوجك على نسخة حية وننتقل به من الفتحة المقاسة إلى عرض سعر مسعّر، وقائمة مواد مكلَّفة، وقائمة قص مرتّبة، وسجل إنتاج — والفأرة في يدك.

45–60 دقيقة · بلا عروض تقديمية · على قاعدة بيانات حية · بالعربية أو الإنجليزية · نرد خلال يوم عمل واحد