Platform · 10 of 15 · Production manager, finance

Every minute, every piece and every kilowatt lands on the job.

Labour and machine time are the costs nobody can see. Here they are measured where they happen and land on the job that consumed them.

OEE you can explain to the person it describes

  • Availability is the share of logged time that was productive
  • Performance is standard time over operating time, capped at 100 %
  • Quality is good pieces over good plus scrap
  • Preventive maintenance genuinely lowers availability, because finishing a maintenance request writes the downtime against the work order

Cost per operation, including the electricity

  • Labour cost is time at the work-centre rate plus piece rate
  • Energy cost is machine kilowatts times run hours times your tariff
  • A payroll export as a batch-stamped file, manager-gated

Who is qualified, and who is quick

  • A skills matrix per operator and work centre, with certification dates
  • First-pass yield and units per hour per operator, computed rather than entered
  • A leaderboard for the shift that treats an unranked operator as unranked, not as last
What this desk watches

The numbers on the wall

The OEE radial and downtime Pareto on Production Control, plus labour and work-order analyses as pivots, and the operator scorecard list.

OEE and its three parts First-pass yield per operator Downtime by reason

What it produces

A payroll export
An OEE and quality summary
A labour analysis
45 دقيقة، مشروعك أنت

أحضر فتحة واحدة.
ونشغّلها من أولها إلى آخرها.

رسم، أو نظام قطاعات، أو عرض سعر سبق أن أرسلته. نحمّل كتالوجك على نسخة حية وننتقل به من الفتحة المقاسة إلى عرض سعر مسعّر، وقائمة مواد مكلَّفة، وقائمة قص مرتّبة، وسجل إنتاج — والفأرة في يدك.

45–60 دقيقة · بلا عروض تقديمية · على قاعدة بيانات حية · بالعربية أو الإنجليزية · نرد خلال يوم عمل واحد