تخطي للذهاب إلى المحتوى
Platform · 07 of 15 · Production planner

A routing graph, a finite-capacity scheduler, and a simulator you can run before you buy the machine.

A window factory is not a line, it is three streams that meet at glazing. Planning here works on that shape rather than pretending the floor is a queue.

Work orders from a routing graph

  • Frame, sash and glass run in parallel and converge where they physically must
  • Planned minutes from the work centre's own capacity, not a flat estimate
  • An order cannot be confirmed without an approval and a material list
  • An order cannot be closed while a work order is still open

Finite capacity, across orders rather than within one

  • Each operation starts after its predecessors and after the machine is free
  • Two orders contend for the same work centre instead of quietly overlapping
  • Level every ready order together and see how many operations were placed

Try the change before you make it

  • A floor planner fed with your real machines, their positions and your open order book
  • Run an experiment: throughput per day and OEE, with confidence intervals
  • Saved scenarios, so 'what if we bought the second welder' is a record rather than an argument
What this desk watches

The numbers on the wall

The live factory overview — machines running and down, work in progress, average OEE, packages ready, print queue, energy drawn — and the Factory Planner itself.

Operations placed per levelling run Machine contention Planned against actual minutes

What it produces

A production order with its work orders scheduled
A floor layout scenario
A throughput and OEE projection
45 دقيقة، مشروعك أنت

أحضر فتحة واحدة.
ونشغّلها من أولها إلى آخرها.

رسم، أو نظام قطاعات، أو عرض سعر سبق أن أرسلته. نحمّل كتالوجك على نسخة حية وننتقل به من الفتحة المقاسة إلى عرض سعر مسعّر، وقائمة مواد مكلَّفة، وقائمة قص مرتّبة، وسجل إنتاج — والفأرة في يدك.

45–60 دقيقة · بلا عروض تقديمية · على قاعدة بيانات حية · بالعربية أو الإنجليزية · نرد خلال يوم عمل واحد