Skip to Content
Platform · 11 of 15 · QC inspector

A failed check stops the job — in the factory and on the scaffold.

A quality system that files a note is a filing system. This one stops the next operation, and on site it stops the handover.

Eight stages, from the gate to the site

  • Incoming material, after cutting, after welding, glazing, hardware, final, pre-dispatch and delivery
  • Yes/no, pass/fail, a measurement with tolerances, a pick list, or a required photo
  • Weighted scoring, with a reason code and a fail action per question
  • A checklist that was never loaded cannot be evaluated — the hole that would let empty answers pass a gate

The gate is a gate

  • A failed blocking check holds the item and raises a non-conformance
  • A held item's operations refuse to become ready or to start
  • Pre-dispatch quality blocks loading; delivery quality blocks the transfer

Non-conformances that name who may decide

  • Eight dispositions, each with an automated action and a minimum authority
  • Use-as-is stamps a signed concession
  • Hold-for-feedback carries a deadline, and a job re-escalates it

On site, in the language the crew reads

  • Checklists written by the office without a developer
  • Question text and inspector guidance both translatable
  • Measurements with tolerance and the deviation recorded
  • A failure re-opens the earlier steps the crew must redo, and blocks handover until it is closed
What this desk watches

The numbers on the wall

Quality and non-conformance analysis as a defect Pareto by root-cause stage and a severity-against-disposition pivot; site quality adds results, failures, first-pass rate, rework and measurements.

First-pass rate Non-conformances by root-cause stage Snags open against handovers due

What it produces

A quality inspection record
A non-conformance with its disposition
A site quality dossier for handover
45 minutes, your job

Bring one opening.
We will run it end to end.

A drawing, a profile system, or a quotation you have already sent. We load your catalogue into a live tenant and take it from the measured opening to a priced quotation, a costed material list, a nested cut list and a production record — with your hands on the mouse.

45–60 minutes · no slides · on a live database · English or Arabic · we reply within one business day